NOTICES: BP West Coast Products LLC et al.,
Published: 2004-12-30
December 23, 2004.
Take notice that on December 22, 2004, BP West Coast Products LLC
(BP) and ExxonMobil Oil Corporation (ExxonMobile) (collective,
Complainants) tendered for filing their Fourth Original Complaint
against SFPP, L.P. Complainants allege that SFPP's West Line Watson
Vapaor Recovery Charge, Sepulveda Line, North Line, Oregon Line
NOTICES: Electric rate and corporate regulation filings,
Published: 2004-12-30
December 23, 2004.
The following filings have been made with the Commission. The filings are listed in ascending order within each docket
classification.
1. Elk River Windfarm LLC
[Docket No. EG0525000]
On December 21, 2004, Elk River Windfarm LLC (Elk River), filed an
application for determination of exempt wholesale generator status
NOTICES: Parker-Davis Project; post-2008 resource pool; power allocation procedures and applications call,
Published: 2004-12-30
The Western Area Power Administration (Western), a Federal
power marketing agency of the Department of Energy (DOE), published a
notice of proposed procedures and call for applications, ParkerDavis
ProjectPost2008 Resource Pool in the Federal Register on October 1,
2004. This notice extends the filing date for the submission of
comments on the
NOTICES: Hydroelectric applications,
Published: 2004-12-30
December 22, 2004.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection.
a. Type of Application: 5MW Exemption.
b. Project No.: 12462000.
c. Date Filed: July 28, 2003.
d. Applicant: Indian River Power Supply, LLC.
e. Name of Project: Indian River.
NOTICES: Crown Landing, LLC; technical conference,
Published: 2004-12-30
December 22, 2004.
On Wednesday, January 12, 2005, at 8:30 a.m. (EDT), staff from the
Commission's Office of Energy Projects will convene a cryogenic design
and technical conference regarding the proposed Crown Landing LNG
import terminal. The cryogenic conference will be held at the Holiday
Inn Hotel located at One Pureland Drive, Swedesboro,
NOTICES: Gulfterra Texas Pipeline, LP; technical conference,
Published: 2004-12-30
December 22, 2004.
Take notice that a technical conference will be held on Thursday,
January 6, 2005, at 1:30 p.m. (EST), in a room to be designated at the
Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426.
The conference will address questions related to the July 12, 2004,
filing by Gulfterra Texas Pipeline,
NOTICES: Market based rates for public utilities; technical conference,
Published: 2004-12-30
December 22, 2004.
Take notice that a technical conference will be held concerning
issues associated with the abovecaptioned rulemaking proceeding on
market based rates. The technical conference will take place on January
27 and 28, 2005, from 9 a.m. to 4:30 p.m. (EST), in the Commission
Meeting Room at the Federal Energy Regulatory Commission,
NOTICES: CenterPoint Energy-Mississippi River Transmission Corp.,
Published: 2004-12-30
December 22, 2004.
Take notice that on December 20, 2004, CenterPoint Energy
Mississippi River Transmission Corporation (MRT) tendered for filing as
part of its FERC Gas Tariff, Third Revised Volume No. 1, the tariff
sheets listed in Appendix A to the filing, to be effective January 19, 2005.
MRT states that the purpose of this filing is to
NOTICES: Columbia Gas Transmission Corp.,
Published: 2004-12-30
December 22, 2004.
Take notice that on December 17, 2004, Columbia Gas Transmission
Corporation (Columbia) tendered for filing as part of its FERC Gas
Tariff, Second Revised Volume No. 1, the following revised tariff sheets with a proposed date of January 16, 2005:
Seventh Revised Sheet No. 108,
Fourth Revised Sheet No. 196,
Third Revised Sheet
NOTICES: Columbia Gulf Transmission Co.,
Published: 2004-12-30
December 22, 2004.
Take notice that on December 17, 2004, Columbia Gulf Transmission
Company (Columbia Gulf) tendered for filing as part of its FERC Gas
Tariff, Second Revised Volume No. 1, the following revised tariff sheets with a proposed date of January 1, 2005:
Thirtysixth Revised Sheet No. 18,
Thirtyseventh Revised Sheet No. 19.
NOTICES: Columbia Gulf Transmission Co.,
Published: 2004-12-30
December 22, 2004.
Take notice that on December 17, 2004, Columbia Gulf Transmission
Company (Columbia Gulf) tendered for filing as part of its FERC Gas
Tariff, Second Revised Volume No. 1, the following revised tariff sheets with a proposed date of January 16, 2005:
Second Revised Sheet No. 87,
Third Revised Sheet No. 94.
Columbia Gulf
NOTICES: Columbia Gulf Transmission Co.,
Published: 2004-12-30
December 22, 2004.
Take notice that on December 17, 2004, Columbia Gulf Transmission
Company (Columbia Gulf) pursuant to Section 19.6 of the General Terms
and Conditions (GTC) of its FERC Gas Tariff, Second Revised Volume No.
1, filed a Penalty Revenue Crediting Report for the 20032004 contract year.
Any person desiring to intervene or to
NOTICES: Cranberry Pipeline Corp.,
Published: 2004-12-30
December 22, 2004.
Take notice that on December 17, 2004, Cranberry Pipeline
Corporation (Cranberry) tendered for filing an Offer of Settlement
(settlement) in the abovereferenced proceeding. The proposed
settlement establishes a systemwide transportation rate of 68.17
cents/Dth pursuant to NGPA section 311(a)(2). The proposed settlement
also
NOTICES: Gulfstream Natural Gas System, L.L.C.,
Published: 2004-12-30
December 22, 2004.
Take notice that on December 20, 2004, Gulfstream Natural Gas
System, L.L.C. (Gulfstream) tendered for filing as part of its FERC Gas
Tariff, Original Volume No. 1, Original Sheet No. 8.01l, reflecting an effective date of January 1, 2004.
Gulfstream states that this filing is being made in connection with
a negotiated
NOTICES: Iroquois Gas Transmission System, L.P.,
Published: 2004-12-30
December 22, 2004.
Take notice that on December 16, 2004, Iroquois Gas Transmission
System, L.P. (Iroquois) tendered for filing as part of its FERC Gas
Tariff, First Revised Volume No. 1, Substitute Third Revised Sheet No. 88, to be effective on December 17, 2004.
Iroquois states that copies of its filing were served on all
jurisdictional
NOTICES: Portland General Electric Co.,
Published: 2004-12-30
December 22, 2004.
The license for Portland General Electric Company's Bull Run
Project No. 477, located on the Sandy, Little Sandy, and Bull Run
Rivers in Clackamas County, Oregon, was issued for a period ending
November 16, 2004. Section 15(a)(1) of the Federal Power Act (FPA), 16
U.S.C. 808(a)(1), requires the Commission, at the expiration
NOTICES: Transcontinental Gas Pipe Line Corp.,
Published: 2004-12-30
December 22, 2004.
Take notice that on December 14, 2004, Transcontinental Gas Pipe
Line Corporation (Transco), P.O. Box 1396, Houston, Texas 77251, filed
an application in Docket No. CP0537000 pursuant to section 7(c) of
the Natural Gas Act (NGA) and part 157(A) of the Commission's
Regulations, for a certificate of public convenience and
NOTICES: Xcel Energy Services, Inc., et al.,
Published: 2004-12-29
December 21, 2004.
On December 17, 2004, the Commission issued an order in the above
docketed proceeding. The Commission's order institutes a proceeding in
Docket No. EL0541000 under section 206 of the Federal Power Act with
respect to the justness and reasonableness of the market based rates of
Xcel Energy Services, Inc. and Southwest Power
NOTICES: Northern States Power Co.,
Published: 2004-12-29
December 21, 2004.
In accordance with the National Environmental Policy Act of 1969,
as amended, and Federal Energy Regulatory Commission (18 CFR part 380),
Commission staff have reviewed the license applications for the
Menomonie and Cedar Falls projects (FERC Project Nos. 2181 and 2697)
and have prepared an environmental assessment (EA). The
NOTICES: Public Utility District No. 2 of Grant County, WA,
Published: 2004-12-29
December 21, 2004.
In accordance with the National Environmental Policy Act of 1969
and the Federal Energy Regulatory Commission's (Commission)
regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office
of Energy Projects has reviewed the application for implementation of
an Interim Protection Plan (IPP) for steelhead and chinook
NOTICES: Wind energy in wholesale electricity markets; technical conference report,
Published: 2004-12-29
December 21, 2004.On December 1, 2004, the Federal Energy Regulatory
Commission (Commission or FERC) held a technical conference in the
above referenced docket to assess the state of wind energy in wholesale
electricity markets. Specifically, the conference focused on potential
policy changes that would better accommodate the participation of wind
NOTICES: BS Energy LP,
Published: 2004-12-29
December 23, 2004.
BS Energy LP (BSELP) filed an application for marketbased rate
authority, with an accompanying tariff. The proposed rate tariff
provides for wholesale sales of energy and capacity at marketbased
rates. BSELP also requested waiver of various Commission regulations.
In particular, BSELP requested that the Commission grant
NOTICES: Destin Pipeline Co., L.L.C.,
Published: 2004-12-29
December 21, 2004.
Take notice that on December 15, 2004, Destin Pipeline Company,
L.L.C. (Destin) tendered for filing as part of its FERC Gas Tariff,
Original Volume No. 1, the tariff sheets listed on Appendix A to the filing, to become effective January 14, 2005.
Destin states that this filing, made in accordance with the
provisions of
NOTICES: Duke Power,
Published: 2004-12-29
December 21, 2004.
On December 15, 2004, the Commission issued an order in the above
docketed proceeding. The Commission's order institutes a proceeding in
Docket No. EL054000 under section 206 of the Federal Power Act with
respect to the justness and reasonableness of Duke Power's marketbased rates.
The refund effective date in Docket No.
NOTICES: Duke Power,
Published: 2004-12-29
December 21, 2004.
On December 15, 2004, the Commission issued an order in the above
docketed proceeding. The Commission's order institutes a proceeding in
Docket No. EL054000 under section 206 of the Federal Power Act with
respect to the justness and reasonableness of Duke Power's marketbased rates.
The refund effective date in Docket No.