1. Extension of Scoping Period for the Notice of Intent to Prepare an Environmental Impact Statement for the Operation
NOTICES: Los Alamos National Laboratory, NM; Biosafety Level 3 Facility,
Dates: The scoping period for the EIS is
Take notice that the following application has been filed with the Commission and is available for public inspection:
a. Application Type: NonProject Use of Project Lands and Waters.
b. Project No.: 271083.
c. Date filed: October 24, 2005.
d. Applicant: Entergy Arkansas, Inc.
e. Name of Project:
Take notice that the Commission received the following electric rate filings:
Docket Numbers: ER00826004; ER00828004; ER98421015; ER98 4055012; ER011337007; ER04288001; ER02177008; ER031212006; ER011820006; ER962506008.
Applicants: Brownsville Power I, L.L.C.; Caledonia Power I, L.L.C., CinCap IV, LLC; CinCap V, LLC;
Liberty Power New York LLC (Liberty Power New York) and Liberty Power District of Columbia LLC (Liberty Power District) filed application for marketbased rate authority, with accompanying rate tariffs. The proposed rate tariffs provide for the sales of capacity and energy at marketbased rates. Liberty Power New York and
Take notice that on December 12, 2005, Alliance Pipeline L.P. (Alliance) tendered for filing as part of its FERC Gas Tariff, Original Volume No. 1, Second Substitute Third Revised Sheet No. 277, proposed to become effective September 1, 2005.
Alliance states that the referenced sheet is being filed in compliance with the
Take notice that on December 14, 2005, the State of Alaska filed a formal complaint against the TAPS Carriers pursuant to 49 U.S.C. 1 et seq. (1994), and 18 CFR 385.206(a), 385.207, 385.211 and 385.214 (2003) alleging that the TAPS Carriers impermissibly included imprudently incurred costs in their 2004, 2005 and 2006
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a. Type of Application: NewMajor License.
b. Project No.: 2085000.
c. Date Filed: November 29, 2005.
d. Applicant: Southern California Edison Company.
e. Name of Project: Mammoth
Take notice that on December 14, 2005, Tennessee Gas Pipeline Company (Tennessee) tendered for filing with the Commission its Statement of Refunds Report (Refund Report), which reflects refunds owed to shippers for Tennessee's collection of the GSR interruptible transportation surcharge.
Tennessee states that the Refund
Take notice that on December 19, 2005, the City of Sioux Falls,
South Dakota and Hearland Consumers Power District (City/Heartland) filed a Complaint against Northern States
[[Page 76801]]
Power Company (Minnesota), Xcel Energy Services, Inc. (Xcel), and the
Midwest Independent System Operator, Inc. (MISO), for their alleged
Take notice that on December 15, 2005, East Tennessee Natural Gas, LLC (East Tennessee) filed for authorization to terminate negotiated rates applicable to East Tennessee's FTA service agreements with Eastman Chemical Company (Eastman) and AFG Industries, Inc. (AFG), effective November 1, 2005.
East Tennessee states that
Take notice that on December 15, 2005, Columbia Gulf Transmission Company (Columbia Gulf) tendered for filing as part of its FERC Gas Tariff, Second Revised Volume No. 1, the tariff sheets listed on Appendix A to the filing, bearing a proposed effective date of January 14, 2006.
Any person desiring to intervene or to
Take notice that the Commission received the following electric rate filings:
Docket Number: ER02971000.
Applicant: DTE East China, LLC.
Description: DTE East China, LLC withdraws their petition for blanket authorizations, certain waivers, and order approving market based rate tariff filed on 2/6/02.
Filed
Take notice that on December 8, 2005, Trunkline Gas Company, LLC (Trunkline), P.O. Box 4967, Houston, Texas 772104967, filed an application in Docket No. CP0635000, pursuant to section 7(b) and (c) of the Natural Gas Act (NGA) and part 157 of the Commission's regulations, for authorization to abandon an existing 2,000
Take notice that the following application has been filed with the Commission and is available for public inspection:
a. Application Type: Nonproject use of Project Lands.
b. Project No.: 2232503.
c. Date Filed: November 21, 2005.
d. Applicant: Duke Power, a division of Duke Energy Corporation. [[Page 76813]]
Take notice that the following application has been filed with the Commission and is available for public inspection:
a. Application Type: NonProject Use of Project Lands and Waters.
b. Project No.: 2145069.
c. Date Filed: December 1, 2005.
d. Applicant: Public Utility District No. 1 of Chelan County.
e. Name
On December 5, 2005, Osage River Flood Control Association, Inc. filed a formal complaint against Union Electric Company, doing business as AmerenUE, licensee of the Osage Hydroelectric Project No. 459. The project is located on the Lake of the Ozarks in Missouri. The pleading generally alleges that Osage River Flood Control
In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's regulations, 18 CFR part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed the application for a subsequent license for the 1.0megawatt Macomb Project, located on the Salmon River, in
Take notice that on December 13, 2005, Entergy Louisiana, Inc. (ELI) submitted a Petition for Declaratory Order in which ELI has requested a determination that the payment of dividends by Entergy Louisiana, LLC out of Membership Interest accounts after it completes a corporate restructuring on or about December 31, 2005 will
Take notice that on December 15, 2005, CenterPoint Energy Gas Transmission Company (CEGT) tendered for filing and approval an amended negotiated rate and nonconforming agreement between CEGT and Kiowa Power Partners, LLC to be effective February 1, 2006.
Take notice that on December 12, 2005, Texas Gas Transmission, LLC (Texas Gas), 3800 Frederica Street, Owensboro, Kentucky 42301, filed with the Federal Energy Regulatory Commission an application under section 7(b) of the Natural Gas Act to abandon by sale to Natural Gas Pipeline Company of America (NGPL) certain supply
Take notice that the following application has been filed with the Commission and is available for public inspection:
a. Application Type: Amendment of License.
b. Project No.: 7161053.
c. Date Filed: October 14, 2005.
d. Applicant: Douglas County, Oregon.
e. Name of Project: Galesville Project.
f.
The following filings have been made with the Commission. The filings are listed in ascending order within each docket
classification.
1. Entergy Services, Inc. et al.
Take notice that on December 16, 2005, Entergy Services, Inc. (Entergy Services) filed with the Federal Energy Regulatory
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 50 CFR Part 679 26 CFR Part 1 40 CFR Part 180 47 CFR Part 73 50 CFR Part 17 33 CFR Part 117 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 33 CFR Part 100 40 CFR Part 63 50 CFR Part 622 26 CFR Part 301 39 CFR Part 111 40 CFR Part 300 50 CFR Part 660 44 CFR Part 65 40 CFR Parts 52 and 81 40 CFR Part 271 47 CFR Part 64 50 CFR Part 665 47 CFR Part 76 50 CFR Part 229 14 CFR Part 23 14 CFR Part 25 21 CFR Part 522