Browse: Departments Dates Agencies
SUBJECT CATEGORY: Extension of Scoping Period for the Notice of Intent to Prepare an Environmental Impact Statement for the Operation of a Biosafety Level 3 Facility at Los Alamos National Laboratory, Los Alamos, NM
DOCUMENT SUMMARY:
Summary: The National Nuclear Security Administration (NNSA), an agency
within the U.S. Department of Energy (DOE), is extending the scoping
period for the Environmental Impact Statement (EIS) on the Operation of
a Biosafety Level 3 Facility at Los Alamos National Laboratory (LANL), Los Alamos, New Mexico.
Dates: The scoping period for the EIS is extended from December 29,
2005, to January 17, 2006. Comments received after that date will be considered to the extent practicable.
Addresses: Written comments or suggestions concerning the scope of the
Biosafety Level 3 Facility (BSL3) EIS or requests for more information
on the EIS and public scoping process may be directed to: Ms. Lisa
Cummings, EIS Document Manager, U.S. Department of Energy, National
Nuclear Security Administration, Office of Los Alamos Site Operations,
528 35th Street, Los Alamos, New Mexico 87544; facsimile at (505) 665
4873; or email at lcummings@doeal.gov. A message may be left for Ms. Cummings at 18665062862.
For Further Information Contact: For information about the DOE NEPA
process, please contact: Ms. Carol Borgstrom, Director, Office of NEPA
Policy and Compliance (EH42), U.S. Department of Energy, 1000
Independence Avenue, SW., Washington, DC 20585, (202) 5864600, or leave a message at 18004722756.
Supplementary Information: Subsequent to issuing an Environmental
Assessment and Finding of No Significant Impact in February 2002, NNSA
constructed a BSL3 Facility at LANL. The BSL3 Facility has never been
operated. On November 29, 2005 (70 FR 71490), NNSA issued an NOI to
prepare an EIS for the proposed operation of the BSL3 Facility. As
originally announced in the Notice of Intent, DOE has conducted public scoping meetings on the EIS in Los Alamos, Santa Fe, and
Espa[ntilde]ola. The original public scoping period was to continue
until December 29, 2005. However, in response to public comments and to ensure that the public has ample opportunity to provide
[[Page 77380]]
comments, DOE is extending the public scoping period until January 17, 2006.
Issued in Washington, DC, on December 28, 2005.
Alice C. Williams,
NNSA NEPA Compliance Officer.
[FR Doc. 0524689 Filed 122905; 8:45 am]
BILLING CODE 645001P
SUMMARY: Los Alamos National Laboratory, NM; Biosafety Level 3 Facility,
DOCUMENT BODY 2:
Summary: The National Nuclear Security Administration (NNSA), an agency
within the U.S. Department of Energy (DOE), is extending the scoping
period for the Environmental Impact Statement (EIS) on the Operation of
a Biosafety Level 3 Facility at Los Alamos National Laboratory (LANL), Los Alamos, New Mexico.
Dates: The scoping period for the EIS is extended from December 29,
2005, to January 17, 2006. Comments received after that date will be considered to the extent practicable.
Addresses: Written comments or suggestions concerning the scope of the
Biosafety Level 3 Facility (BSL3) EIS or requests for more information
on the EIS and public scoping process may be directed to: Ms. Lisa
Cummings, EIS Document Manager, U.S. Department of Energy, National
Nuclear Security Administration, Office of Los Alamos Site Operations,
528 35th Street, Los Alamos, New Mexico 87544; facsimile at (505) 665
4873; or email at lcummings@doeal.gov. A message may be left for Ms. Cummings at 18665062862.
For Further Information Contact: For information about the DOE NEPA
process, please contact: Ms. Carol Borgstrom, Director, Office of NEPA
Policy and Compliance (EH42), U.S. Department of Energy, 1000
Independence Avenue, SW., Washington, DC 20585, (202) 5864600, or leave a message at 18004722756.
Supplementary Information: Subsequent to issuing an Environmental
Assessment and Finding of No Significant Impact in February 2002, NNSA
constructed a BSL3 Facility at LANL. The BSL3 Facility has never been
operated. On November 29, 2005 (70 FR 71490), NNSA issued an NOI to
prepare an EIS for the proposed operation of the BSL3 Facility. As
originally announced in the Notice of Intent, DOE has conducted public scoping meetings on the EIS in Los Alamos, Santa Fe, and
Espa[ntilde]ola. The original public scoping period was to continue
until December 29, 2005. However, in response to public comments and to ensure that the public has ample opportunity to provide
[[Page 77380]]
comments, DOE is extending the public scoping period until January 17, 2006.
Issued in Washington, DC, on December 28, 2005.
Alice C. Williams,
NNSA NEPA Compliance Officer.
[FR Doc. 0524689 Filed 122905; 8:45 am]
BILLING CODE 645001P
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 50 CFR Part 679 47 CFR Part 73 26 CFR Part 1 40 CFR Part 180 33 CFR Part 117 50 CFR Part 17 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 40 CFR Part 63 33 CFR Part 100 50 CFR Part 622 50 CFR Part 660 44 CFR Part 65 26 CFR Part 301 39 CFR Part 111 40 CFR Part 300 6 CFR Part 5 40 CFR Part 271 47 CFR Part 64 40 CFR Parts 52 and 81 50 CFR Part 665 10 CFR Part 50 44 CFR Part 64 49 CFR Part 571 39 CFR Part 3020