Browse: Departments Dates Agencies
Docket ID: [Docket No. DI08-8-000]
SUBJECT CATEGORY: Nushagak Electric and Telephone Cooperative; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or Motions To Intervene
DOCUMENT SUMMARY: June 24, 2008.
Take notice that the following application has been filed with the Commission and is available for public inspection:
a. Application Type: Declaration of Intention.
b. Docket No.: DI088000.
c. Date Filed: June 6, 2008.
d. Applicant: Nushagak Electric and Telephone Cooperative.
e. Name of Project: Grant Lake Hydroelectric Project.
f. Location: The proposed Grant Lake Hydroelectric Project will be located on Grant Creek and Grant Lake, near the town of Dillingham, Dillingham Borough, Alaska, affecting T. 4 S, R. 5455 W, sec. 28, 29, 32, and 33, Seward Meridian.
g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b).
h. Applicant Contact: Frank Corbin, CEO/General Manager, P.O. Box 350, 557 Kenny Wren Road, Dillingham, AK 99576; telephone: (907) 842 6315; Fax: (907) 8422780; email: www.fcorbin@nushagak.coop.
i. FERC Contact: Any questions on this notice should be addressed to Henry Ecton, (202) 5028768, or email address:
henry.ecton@ferc.gov.
j. Deadline for filing comments, protests, and/or motions: July 25, 2008.
All documents (original and eight copies) should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and/or interventions may be filed electronically via the Internet in lieu of paper. Any questions, please contact the Secretary's Office. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site at http:// www.ferc.gov under the ``eFiling'' link.
Please include the docket number (DI088000) on any comments, protests, and/or motions filed.
k. Description of Project: The proposed Grant Lake Hydropower Project will include: (1) A proposed 52,500acrefeet storage reservoir; (2) a concrete dam located at the outlet of Grant Lake; (3) a 20footdeep, 1milelong diversion canal extending from the dam to a rock fill dike and intake; (4) a 6,600footlong, 544footdiameter laketap intake pipeline connecting at a surge tank to a 3,100foot long, 5footdiameter steel penstock; (5) a steelframed powerhouse, containing two 1,350kW turbine/generators; (6) a 45to65milelong buried transmission line; and (7) appurtenant facilities. The proposed project will not be connected to an interstate grid, and will not occupy any tribal or Federal lands.
When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the interests of interstate or foreign commerce would be affected by the project. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy or affect public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that may have increased or would increase the project's head or generating capacity, or have otherwise significantly modified the project's pre1935 design or operation.
l. Locations of the Application: Copies of this filing are on file
with the Commission and are available for public inspection. This
filing may be viewed on the Web at http://www.ferc.gov using the
``eLibrary'' link, select ``Docket
m. Comments, Protests, or Motions to InterveneAnyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.
n. Filing and Service of Responsive DocumentsAny filings must
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', AND/
OR ``MOTIONS TO INTERVENE'', as applicable, and the Docket Number of
the particular application to which the filing refers. A copy of any
motion to intervene must also be served upon each representative of the Applicant specified in the particular application.
Kimberly D. Bose,
Secretary.
[FR Doc. E815082 Filed 7208; 8:45 am]
BILLING CODE 671701P
SUMMARY: Nushagak Electric and Telephone Cooperative,
DOCUMENT BODY 2: June 24, 2008.
Take notice that the following application has been filed with the Commission and is available for public inspection:
a. Application Type: Declaration of Intention.
b. Docket No.: DI088000.
c. Date Filed: June 6, 2008.
d. Applicant: Nushagak Electric and Telephone Cooperative.
e. Name of Project: Grant Lake Hydroelectric Project.
f. Location: The proposed Grant Lake Hydroelectric Project will be located on Grant Creek and Grant Lake, near the town of Dillingham, Dillingham Borough, Alaska, affecting T. 4 S, R. 5455 W, sec. 28, 29, 32, and 33, Seward Meridian.
g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b).
h. Applicant Contact: Frank Corbin, CEO/General Manager, P.O. Box 350, 557 Kenny Wren Road, Dillingham, AK 99576; telephone: (907) 842 6315; Fax: (907) 8422780; email: www.fcorbin@nushagak.coop.
i. FERC Contact: Any questions on this notice should be addressed to Henry Ecton, (202) 5028768, or email address:
henry.ecton@ferc.gov.
j. Deadline for filing comments, protests, and/or motions: July 25, 2008.
All documents (original and eight copies) should be filed with: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. Comments, protests, and/or interventions may be filed electronically via the Internet in lieu of paper. Any questions, please contact the Secretary's Office. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site at http:// www.ferc.gov under the ``eFiling'' link.
Please include the docket number (DI088000) on any comments, protests, and/or motions filed.
k. Description of Project: The proposed Grant Lake Hydropower Project will include: (1) A proposed 52,500acrefeet storage reservoir; (2) a concrete dam located at the outlet of Grant Lake; (3) a 20footdeep, 1milelong diversion canal extending from the dam to a rock fill dike and intake; (4) a 6,600footlong, 544footdiameter laketap intake pipeline connecting at a surge tank to a 3,100foot long, 5footdiameter steel penstock; (5) a steelframed powerhouse, containing two 1,350kW turbine/generators; (6) a 45to65milelong buried transmission line; and (7) appurtenant facilities. The proposed project will not be connected to an interstate grid, and will not occupy any tribal or Federal lands.
When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the interests of interstate or foreign commerce would be affected by the project. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy or affect public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that may have increased or would increase the project's head or generating capacity, or have otherwise significantly modified the project's pre1935 design or operation.
l. Locations of the Application: Copies of this filing are on file
with the Commission and are available for public inspection. This
filing may be viewed on the Web at http://www.ferc.gov using the
``eLibrary'' link, select ``Docket
m. Comments, Protests, or Motions to InterveneAnyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.
n. Filing and Service of Responsive DocumentsAny filings must
bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', AND/
OR ``MOTIONS TO INTERVENE'', as applicable, and the Docket Number of
the particular application to which the filing refers. A copy of any
motion to intervene must also be served upon each representative of the Applicant specified in the particular application.
Kimberly D. Bose,
Secretary.
[FR Doc. E815082 Filed 7208; 8:45 am]
BILLING CODE 671701P
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 50 CFR Part 679 47 CFR Part 73 26 CFR Part 1 40 CFR Part 180 33 CFR Part 117 50 CFR Part 17 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 33 CFR Part 100 40 CFR Part 63 50 CFR Part 622 44 CFR Part 65 50 CFR Part 660 26 CFR Part 301 39 CFR Part 111 40 CFR Part 300 6 CFR Part 5 40 CFR Part 271 47 CFR Part 64 40 CFR Parts 52 and 81 50 CFR Part 665 44 CFR Part 64 10 CFR Part 50 49 CFR Part 571 47 CFR Part 76