Browse: Departments Dates Agencies
Docket ID: [Docket No. DI08-13-000]
SUBJECT CATEGORY: James and Patricia Tyrpin; Notice of Declaration of Intention and
DOCUMENT SUMMARY: Soliciting Comments, Protests, and/or Motions To Intervene
Take notice that the following application has been filed with the Commission and is available for public inspection:
a. Application Type: Declaration of Intention.
b. Docket No.: DI0813000.
c. Date Filed: August 7, 2008.
d. Applicant: James and Patricia Tyrpin.
e. Name of Project: Tyrpin Micro Hydro Project.
f. Location: The proposed Tyrpin Micro Hydro Project will be located on an unnamed Creek in West Finley Township, Washington County, Pennsylvania.
g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b).
h. Applicant Contact: James and Patricia Tyrpin, 2278 E. National
Pike, Scenery Hill, PA 15360; telephone: (724) 7691439; Fax: (724)
7691439; email: http://www.James.tyrpin@us.army.mil.
i. FERC Contact: Any questions on this notice should be addressed to Henry Ecton, (202) 5028768, or email address:
henry.ecton@ferc.gov.
j. Deadline for filing comments, protests, and/or motions: September 19, 2008.
All documents (original and eight copies) should be filed with:
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. Comments, protests, and/or interventions may be
filed electronically via the Internet in lieu of paper. Any questions,
please contact the Secretary's Office. See, 18 CFR 385.2001(a)(1)(iii)
and the instructions on the Commission's Web site at http://
www.ferc.gov under the ``eFiling'' link.
Please include the docket number (DI0813000) on any comments, protests, and/or motions filed.
k. Description of Project: The proposed runofriver Tyrpin Micro Hydro Project will include: (1) A 2to4inch, 1,500footlong pipe from an intake on an unnamed stream to a proposed powerhouse, containing a <10kW generator; (2) a short tailrace, returning the water to the unnamed stream; and (3) appurtenant facilities. Power generated will be used onsite. The project will not be connected to an interstate grid.
When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the interests of interstate or foreign commerce would be affected by the project. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy or affect public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that may have increased or would increase the project's head or generating capacity, or have otherwise significantly modified the project's pre1935 design or operation.
l. Locations of the Application: Copies of this filing are on file
with the Commission and are available for public inspection. This
filing may be viewed on the Web at http://www.ferc.gov using the
``eLibrary'' link; select ``Docket
m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions To Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filings must bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', AND/ OR ``MOTIONS TO INTERVENE'', as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application.
p. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives. Kimberly D. Bose,
Secretary.
[FR Doc. E819681 Filed 82508; 8:45 am]
BILLING CODE 671701P
SUMMARY: James and Patricia Tyrpin,
DOCUMENT BODY 2: Soliciting Comments, Protests, and/or Motions To Intervene
Take notice that the following application has been filed with the Commission and is available for public inspection:
a. Application Type: Declaration of Intention.
b. Docket No.: DI0813000.
c. Date Filed: August 7, 2008.
d. Applicant: James and Patricia Tyrpin.
e. Name of Project: Tyrpin Micro Hydro Project.
f. Location: The proposed Tyrpin Micro Hydro Project will be located on an unnamed Creek in West Finley Township, Washington County, Pennsylvania.
g. Filed Pursuant to: Section 23(b)(1) of the Federal Power Act, 16 U.S.C. 817(b).
h. Applicant Contact: James and Patricia Tyrpin, 2278 E. National
Pike, Scenery Hill, PA 15360; telephone: (724) 7691439; Fax: (724)
7691439; email: http://www.James.tyrpin@us.army.mil.
i. FERC Contact: Any questions on this notice should be addressed to Henry Ecton, (202) 5028768, or email address:
henry.ecton@ferc.gov.
j. Deadline for filing comments, protests, and/or motions: September 19, 2008.
All documents (original and eight copies) should be filed with:
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426. Comments, protests, and/or interventions may be
filed electronically via the Internet in lieu of paper. Any questions,
please contact the Secretary's Office. See, 18 CFR 385.2001(a)(1)(iii)
and the instructions on the Commission's Web site at http://
www.ferc.gov under the ``eFiling'' link.
Please include the docket number (DI0813000) on any comments, protests, and/or motions filed.
k. Description of Project: The proposed runofriver Tyrpin Micro Hydro Project will include: (1) A 2to4inch, 1,500footlong pipe from an intake on an unnamed stream to a proposed powerhouse, containing a <10kW generator; (2) a short tailrace, returning the water to the unnamed stream; and (3) appurtenant facilities. Power generated will be used onsite. The project will not be connected to an interstate grid.
When a Declaration of Intention is filed with the Federal Energy Regulatory Commission, the Federal Power Act requires the Commission to investigate and determine if the interests of interstate or foreign commerce would be affected by the project. The Commission also determines whether or not the project: (1) Would be located on a navigable waterway; (2) would occupy or affect public lands or reservations of the United States; (3) would utilize surplus water or water power from a government dam; or (4) if applicable, has involved or would involve any construction subsequent to 1935 that may have increased or would increase the project's head or generating capacity, or have otherwise significantly modified the project's pre1935 design or operation.
l. Locations of the Application: Copies of this filing are on file
with the Commission and are available for public inspection. This
filing may be viewed on the Web at http://www.ferc.gov using the
``eLibrary'' link; select ``Docket
m. Individuals desiring to be included on the Commission's mailing list should so indicate by writing to the Secretary of the Commission.
n. Comments, Protests, or Motions To Intervene: Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.
o. Filing and Service of Responsive Documents: Any filings must bear in all capital letters the title ``COMMENTS'', ``PROTESTS'', AND/ OR ``MOTIONS TO INTERVENE'', as applicable, and the Docket Number of the particular application to which the filing refers. A copy of any motion to intervene must also be served upon each representative of the Applicant specified in the particular application.
p. Agency Comments: Federal, state, and local agencies are invited
to file comments on the described application. A copy of the
application may be obtained by agencies directly from the Applicant. If
an agency does not file comments within the time specified for filing
comments, it will be presumed to have no comments. One copy of an
agency's comments must also be sent to the Applicant's representatives. Kimberly D. Bose,
Secretary.
[FR Doc. E819681 Filed 82508; 8:45 am]
BILLING CODE 671701P
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 50 CFR Part 679 47 CFR Part 73 26 CFR Part 1 40 CFR Part 180 33 CFR Part 117 50 CFR Part 17 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 33 CFR Part 100 40 CFR Part 63 50 CFR Part 622 44 CFR Part 65 50 CFR Part 660 26 CFR Part 301 39 CFR Part 111 40 CFR Part 300 6 CFR Part 5 40 CFR Part 271 47 CFR Part 64 40 CFR Parts 52 and 81 50 CFR Part 665 44 CFR Part 64 10 CFR Part 50 49 CFR Part 571 47 CFR Part 76