Docket ID: [Docket No. CP08-457-000]
SUBJECT CATEGORY: CenterPoint Energy Gas Transmission Company-Mississippi River Transmission Corporation; Notice of Request Under Blanket Authorization
DOCUMENT SUMMARY: August 15, 2008.
Take notice that on August 6, 2008, CenterPoint Energy Gas
Transmission CompanyMississippi River Transmission Corporation (MRT),
1111 Louisiana Street, Houston, Texas, 77002 filed in Docket No. CP08
457000 a prior notice request pursuant to sections 157.205 and
157.213(b) of the Commission's regulations under the Natural Gas Act
(NGA), and MRT's blanket certificate issued in Docket No. CP82489 000.\1\ MRT seeks
[[Page 50610]]
authorization to drill, own and operate four new vertical storage
wells, 3.4 miles of 6inch and 4inch associated storage field flow
lines, 4inch orifice meters and appurtenant measurement facilities
including one automatic and three manual control valves, and
approximately 1.3 miles of new permanent access roads, all within MRT's
East Unionville Storage Field (East Unionville) in Lincoln Parish,
Louisiana, all as more fully set forth in the application which is on
file with the Commission and open to public inspection. The filing may
also be viewed on the Web at http://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC at FERCOnlineSupport@ferc.gov or call tollfree, (886) 2083676 or TYY, (202) 5028659.
Specifically, MRT proposes to construct, own and operate the four
new wells and appurtenant facilities for the purpose of recovering non
effective gas and restoring late season deliverability for MRT's
customers. Pursuant to the requirements of section 157.213(b) of the
Commission's regulations, the proposed facilities will not impact the
total inventory, pressure, boundaries, or certificated capacity of East
Unionville. MRT projects that after successful completion of the project, it will be able to increase its midto lateseason
deliverability from 340 MMcf/d to 390 MMcf/d.\2\ As MRT is obligated by
Article 7.4 of its 2001 Uncontested Stipulation and Agreement in Docket
Nos. TM00125000, et al., and RP01292000, et al., to restore the
late season deliverability and to bear all costs incurred to meet
customer deliverability requirements,\3\ MRT is not requesting rolled
in rate treatment for the approximately $15.9 million cost associated
with the construction of the proposed facilities. These costs will be
recorded and maintained in a separate account to be excluded from MRT's rate base in any future rate case.
\2\ MRT's certificated maximum withdrawal volume is 480,000 Mcf/ d [51 FPC ] 1,866 (1974)].
Any questions regarding this application should be directed to Lawrence O. Thomas, Director, Rate & Regulatory, CenterPoint Energy Mississippi River Transmission Corporation, P.O. Box 21743, SupervisorRate & Regulatory, CenterPoint Energy Gas Transmission Company, P.O. Box 21734, Shreveport, Louisiana 71151, or call (318) 4292804, FAX (318) 4293133.
Any person or the Commission's Staff may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and, pursuant to section 157.205 of the Commission's Regulations under the NGA (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the NGA.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the Internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (http://www.ferc.gov) under the ``eFiling'' link. Persons unable
to file electronically should submit an original and 14 copies of the
protest or intervention to the Federal Energy regulatory Commission, 888 First Street, NE., Washington, DC 20426.
Comment Date: October 14, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E819823 Filed 82608; 8:45 am]
BILLING CODE 671701P
SUMMARY: CenterPoint Energy Gas Transmission Co.-Mississippi River Transmission Corp.,
DOCUMENT BODY 2: August 15, 2008.
Take notice that on August 6, 2008, CenterPoint Energy Gas
Transmission CompanyMississippi River Transmission Corporation (MRT),
1111 Louisiana Street, Houston, Texas, 77002 filed in Docket No. CP08
457000 a prior notice request pursuant to sections 157.205 and
157.213(b) of the Commission's regulations under the Natural Gas Act
(NGA), and MRT's blanket certificate issued in Docket No. CP82489 000.\1\ MRT seeks
[[Page 50610]]
authorization to drill, own and operate four new vertical storage
wells, 3.4 miles of 6inch and 4inch associated storage field flow
lines, 4inch orifice meters and appurtenant measurement facilities
including one automatic and three manual control valves, and
approximately 1.3 miles of new permanent access roads, all within MRT's
East Unionville Storage Field (East Unionville) in Lincoln Parish,
Louisiana, all as more fully set forth in the application which is on
file with the Commission and open to public inspection. The filing may
also be viewed on the Web at http://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC at FERCOnlineSupport@ferc.gov or call tollfree, (886) 2083676 or TYY, (202) 5028659.
Specifically, MRT proposes to construct, own and operate the four
new wells and appurtenant facilities for the purpose of recovering non
effective gas and restoring late season deliverability for MRT's
customers. Pursuant to the requirements of section 157.213(b) of the
Commission's regulations, the proposed facilities will not impact the
total inventory, pressure, boundaries, or certificated capacity of East
Unionville. MRT projects that after successful completion of the project, it will be able to increase its midto lateseason
deliverability from 340 MMcf/d to 390 MMcf/d.\2\ As MRT is obligated by
Article 7.4 of its 2001 Uncontested Stipulation and Agreement in Docket
Nos. TM00125000, et al., and RP01292000, et al., to restore the
late season deliverability and to bear all costs incurred to meet
customer deliverability requirements,\3\ MRT is not requesting rolled
in rate treatment for the approximately $15.9 million cost associated
with the construction of the proposed facilities. These costs will be
recorded and maintained in a separate account to be excluded from MRT's rate base in any future rate case.
\2\ MRT's certificated maximum withdrawal volume is 480,000 Mcf/ d [51 FPC ] 1,866 (1974)].
Any questions regarding this application should be directed to Lawrence O. Thomas, Director, Rate & Regulatory, CenterPoint Energy Mississippi River Transmission Corporation, P.O. Box 21743, SupervisorRate & Regulatory, CenterPoint Energy Gas Transmission Company, P.O. Box 21734, Shreveport, Louisiana 71151, or call (318) 4292804, FAX (318) 4293133.
Any person or the Commission's Staff may, within 60 days after the issuance of the instant notice by the Commission, file pursuant to Rule 214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to intervene or notice of intervention and, pursuant to section 157.205 of the Commission's Regulations under the NGA (18 CFR 157.205) a protest to the request. If no protest is filed within the time allowed therefore, the proposed activity shall be deemed to be authorized effective the day after the time allowed for protest. If a protest is filed and not withdrawn within 30 days after the time allowed for filing a protest, the instant request shall be treated as an application for authorization pursuant to Section 7 of the NGA.
The Commission strongly encourages electronic filings of comments,
protests, and interventions via the Internet in lieu of paper. See 18
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web
site (http://www.ferc.gov) under the ``eFiling'' link. Persons unable
to file electronically should submit an original and 14 copies of the
protest or intervention to the Federal Energy regulatory Commission, 888 First Street, NE., Washington, DC 20426.
Comment Date: October 14, 2008.
Kimberly D. Bose,
Secretary.
[FR Doc. E819823 Filed 82608; 8:45 am]
BILLING CODE 671701P
14 CFR Part 39 40 CFR Part 52 14 CFR Part 71 33 CFR Part 165 50 CFR Part 679 47 CFR Part 73 26 CFR Part 1 40 CFR Part 180 33 CFR Part 117 50 CFR Part 17 44 CFR Part 67 50 CFR Part 648 14 CFR Part 97 33 CFR Part 100 40 CFR Part 63 50 CFR Part 622 44 CFR Part 65 50 CFR Part 660 26 CFR Part 301 39 CFR Part 111 40 CFR Part 300 6 CFR Part 5 40 CFR Part 271 47 CFR Part 64 40 CFR Parts 52 and 81 50 CFR Part 665 44 CFR Part 64 10 CFR Part 50 49 CFR Part 571 47 CFR Part 76