<?xml version='1.0' encoding='utf-8'?>

<rss version="2.0">
  <channel>
    <title>The Federal Register</title>
    <link>http://thefederalregister.com/b.p/agency/Federal_Energy_Regulatory_Commission/2008-07-16/</link>
    <description>Daily Publications of Meetings and Rules Changes for the Federal Government</description>
    <pubDate>Mon, Dec 1 2008 11:00:00 GMT</pubDate>
    <lastBuildDate>Mon, Dec 1 2008 11:00:00 GMT</lastBuildDate>
    <webMaster>info@thefederalregister.com</webMaster>
    <item>
  <title><![CDATA[  Birch Power Company; BPUS Generation Development LLC; Notice of  Competing Preliminary Permit Applications Accepted]]></title>
  <link>http://thefederalregister.com/d.p/2008-07-16-E8-16203</link>
  <description><![CDATA[ July 9, 2008.</p><p>    On February 1, 2008, at 8:32 a.m. and 8:39 a.m. respectively, Birch 
Power Company (Birch Power) and BPUS Generation Development LLC (BPUS 
Generation) filed applications, pursuant to section 4(f) of the Federal 
Power Act, proposing to study the feasibility of the Coffeeville Lock 
and Dam Hydroelectric Project, to be located at the existing U.S. Army 
Corp of Engineers (Corps) Coffeeville Lock and Dam on the Tombigbee  River in Choctaw and Clarke Counties, Alabama.</p><p>    The proposed projects would use the existing Corps Coffeeville Lock 
and Dam and would respectively consist of, for Birch Power and BPUS 
Generation: (1) A proposed powerhouse containing several generating 
units having total installed capacities of 9.55 and 24 megawatts, (2) a 
proposed intake and tailrace, (3) a proposed transmission line, and (4) 
appurtenant facilities. The projects would, respectively, have an 
annual generation of 62 and 48 gigawatthours that would be sold to a  local utility.</p><p>    Applicant Contact: f<script type="text/javascript">
<!--
google_ad_client = "pub-2051746026283201";
google_ad_width = 728;
google_ad_height = 15;
google_ad_format = "728x15_0ads_al";
//2007-08-22: federalregister-rss
google_ad_channel = "2005962856";
google_color_border = "CC0000";
google_color_bg = "FFFFFF";
google_color_link = "CC0000";
google_color_text = "000000";
google_color_url = "008000";
//-->
</script>
<script type="text/javascript"
  src="http://pagead2.googlesyndication.com/pagead/show_ads.js">
</script>
]]></description>
  <guid>http://thefederalregister.com/d.p/2008-07-16-E8-16203</guid>
  <pubDate>Wed, Jul 16 2008 11:00:00 GMT</pubDate>
</item>
<item>
  <title><![CDATA[  Brookfield Power Piney & Deep Creek, LLC; Notice of Application  Accepted for Filing, Soliciting Motions To Intervene]]></title>
  <link>http://thefederalregister.com/d.p/2008-07-16-E8-16209</link>
  <description><![CDATA[ July 9, 2008.</p><p>    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection: </p><p>    a. Type of Application: Amendment of License.<br/> </p><p>    b. Project No.: 309062.<br/> </p><p>    c. Date Filed: January 22, 2008.</p><p>    d. Applicant: Brookfield Power Piney & Deep Creek, LLC.
</p><p>    e. Name of Project: Piney Hydroelectric Project.
</p><p>    f. Location: The project is located on the Clarion River, in 
Clarion County, Pennsylvania. The project does not occupy any federal  lands.</p><p>    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)825(r).
</p><p>    h. Applicant Contacts: Mr. David Barnhart, West Virginia Production 
Center, P.O. Box 849, Gauley Bridge, WV 25085, (304) 9816504, and Mr. 
Glen Neiport, Brookfield Power Piney & Deep Creek, LLC, Piney Station,  2000 River Road, Clarion, PA 16214, (814) 2268630.</p><p>    i. FERC Contact: Kelly Houff, (202) 5026393, and email 
<A HREF="mailto:Kelly.Houff@ferc.gov">Kelly.Houff@ferc.gov</A>.
</p><p>    j. Deadline for filing comments, pro<script type="text/javascript">
<!--
google_ad_client = "pub-2051746026283201";
google_ad_width = 728;
google_ad_height = 15;
google_ad_format = "728x15_0ads_al";
//2007-08-22: federalregister-rss
google_ad_channel = "2005962856";
google_color_border = "CC0000";
google_color_bg = "FFFFFF";
google_color_link = "CC0000";
google_color_text = "000000";
google_color_url = "008000";
//-->
</script>
<script type="text/javascript"
  src="http://pagead2.googlesyndication.com/pagead/show_ads.js">
</script>
]]></description>
  <guid>http://thefederalregister.com/d.p/2008-07-16-E8-16209</guid>
  <pubDate>Wed, Jul 16 2008 11:00:00 GMT</pubDate>
</item>
<item>
  <title><![CDATA[  Canyon Creek Compression Company; Notice of Application ]]></title>
  <link>http://thefederalregister.com/d.p/2008-07-16-E8-16212</link>
  <description><![CDATA[ July 9, 2008.</p><p>    Take notice that on June 30, 2008, Canyon Creek Compression Company 
(Canyon), 3250 Lacey Road, 7th Floor, Downers Grove, Illinois 60515, 
filed in the above referenced docket an application pursuant to section 
7(b) of the Natural Gas Act (NGA), and Sections 157.7 and 157.18 of the 
Commission's regulations for an order granting a certificate of public 
convenience to abandon: (1) Its 22,000 horsepower (HP) compressor 
station and other appurtenant facilities located in Uinta County, 
Wyoming (CS 730) as authorized in Docket No. CP80547, as amended; (2) 
its blanket certificate issued in Docket No. 891497000 which 
authorized Canyon to compress/transport natural gas in interstate 
commerce for interstate pipelines and others pursuant to Subpart G of 
Part 284 of the Commission's regulations; (3) its blanket certificate 
issued in Docket No. CP9218000 which authorized Canyon to engage in 
certain routine jurisdictional activities and for permission and 
approval to abandon certain services <script type="text/javascript">
<!--
google_ad_client = "pub-2051746026283201";
google_ad_width = 728;
google_ad_height = 15;
google_ad_format = "728x15_0ads_al";
//2007-08-22: federalregister-rss
google_ad_channel = "2005962856";
google_color_border = "CC0000";
google_color_bg = "FFFFFF";
google_color_link = "CC0000";
google_color_text = "000000";
google_color_url = "008000";
//-->
</script>
<script type="text/javascript"
  src="http://pagead2.googlesyndication.com/pagead/show_ads.js">
</script>
]]></description>
  <guid>http://thefederalregister.com/d.p/2008-07-16-E8-16212</guid>
  <pubDate>Wed, Jul 16 2008 11:00:00 GMT</pubDate>
</item>
<item>
  <title><![CDATA[  City of Holyoke Gas and Electric; Notice of Application for  Amendment of License and Soliciting Comments, Motions To]]></title>
  <link>http://thefederalregister.com/d.p/2008-07-16-E8-16208</link>
  <description><![CDATA[ July 9, 2008.</p><p>    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection:
</p><p>    a. Application Type: NonProject Use of Project Lands and Waters  and Amendment of Project Boundary.<br/> </p><p>    b. Project No: 2004249.<br/> </p><p>    c. Date Filed: May 28, 2008.<br/> </p><p>    d. Applicant: City of Holyoke Gas and Electric.</p><p>    e. Name of Project: Holyoke Hydroelectric Project.
</p><p>    f. Location: The proposal would be located on the Connecticut  River, in Hampden County, Massachusetts.</p><p>    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a825r.
</p><p>    h. Applicant Contact: Paul Ducheney, 99 Suffolk Street, Holyoke, MA  01040; (413) 5369340.</p><p>    i. FERC Contact: Gina Krump, Telephone (202) 5026704, and email: 
<A HREF="mailto:Gina.Krump@ferc.gov">Gina.Krump@ferc.gov</A>. [[Page 40863]]</p><p>    j. Deadline for filing comments, motions to intervene, and protest:  August 11, 2008.</p><p>    All documents (original and eight copies) should be filed with: 
Kimberly D. Bose, Secretar<script type="text/javascript">
<!--
google_ad_client = "pub-2051746026283201";
google_ad_width = 728;
google_ad_height = 15;
google_ad_format = "728x15_0ads_al";
//2007-08-22: federalregister-rss
google_ad_channel = "2005962856";
google_color_border = "CC0000";
google_color_bg = "FFFFFF";
google_color_link = "CC0000";
google_color_text = "000000";
google_color_url = "008000";
//-->
</script>
<script type="text/javascript"
  src="http://pagead2.googlesyndication.com/pagead/show_ads.js">
</script>
]]></description>
  <guid>http://thefederalregister.com/d.p/2008-07-16-E8-16208</guid>
  <pubDate>Wed, Jul 16 2008 11:00:00 GMT</pubDate>
</item>
<item>
  <title><![CDATA[  Augusta Canal Authority; Notice of Application Ready for  Environmental Analysis and Soliciting Comments,]]></title>
  <link>http://thefederalregister.com/d.p/2008-07-16-E8-16201</link>
  <description><![CDATA[ July 9, 2008.</p><p>    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection. </p><p>    a. Type of Application: New Major License.<br/> </p><p>    b. Project No.: P9988015.<br/> </p><p>    c. Date filed: May 31, 2007.<br/> </p><p>    d. Applicant: Augusta Canal Authority.</p><p>    e. Name of Project: King Mill Hydroelectric Project.
</p><p>    f. Location: The King Mill Project is located on the Augusta Canal 
about 6 miles downstream of the Augusta Diversion Dam, adjacent to the 
Savannah River, Richmond County, Augusta, GA. The project does not  affect federal lands.</p><p>    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)825(r)
</p><p>    h. Applicant Contact: Mr. Dayton Sherrouse, Executive Director, 
Augusta Canal Authority, 1450 Green Street, Suite 400, Augusta, GA  30901; Telephone (706) 8230440, Ext. 1.</p>
<h3>[[Page 40860]]</h3>
<p>    i. FERC Contact: Sarah Florentino, Telephone (202) 5026863, or e
mail <A HREF="mailto:sarah.florentino@ferc.gov">sarah.florentino@ferc.gov</A>. Additional informatio<script type="text/javascript">
<!--
google_ad_client = "pub-2051746026283201";
google_ad_width = 728;
google_ad_height = 15;
google_ad_format = "728x15_0ads_al";
//2007-08-22: federalregister-rss
google_ad_channel = "2005962856";
google_color_border = "CC0000";
google_color_bg = "FFFFFF";
google_color_link = "CC0000";
google_color_text = "000000";
google_color_url = "008000";
//-->
</script>
<script type="text/javascript"
  src="http://pagead2.googlesyndication.com/pagead/show_ads.js">
</script>
]]></description>
  <guid>http://thefederalregister.com/d.p/2008-07-16-E8-16201</guid>
  <pubDate>Wed, Jul 16 2008 11:00:00 GMT</pubDate>
</item>
<item>
  <title><![CDATA[  Hydrodynamics, Inc.; Notice of Preliminary Permit Application  Accepted for Filing and Soliciting Comment, Motions To]]></title>
  <link>http://thefederalregister.com/d.p/2008-07-16-E8-16205</link>
  <description><![CDATA[ July 9, 2008.</p><p>    On April 1, 2008, Hydrodynamics, Inc. filed an application,  pursuant to<br/> [[Page 40864]]<br/>
section 4(f) of the Federal Power Act, proposing to study the 
feasibility of the Sun River Diversion Dam Project, to be located on an 
existing dam owned by the U.S. Bureau of Reclamation (USBR), on the Sun 
River in Teton and Lewis and Clark Counties, Montana, on lands  administered by the USBR.</p><p>    The proposed project would consist of: (1) A proposed 900foot
long, 10footwide penstock, (2) a proposed powerhouse containing two 
generating units having a total installed capacity of 12 megawatts, (3) 
a proposed onequartermilelong, 15kV transmission line, and (4) 
appurtenant facilities. The project would have an annual generation of  50 gigawatthours that would be sold to a local utility.</p><p>    Applicant Contact: Mr. Roger Kirk, Hydrodynamics, Inc., P.O. Box 
1136, Bozeman, MT 59771; phone: 4065875086. FERC Contact: Tom  Papsidero, 2025026002.</p><p>    Deadline for filing comments, motions to intervene, compet<script type="text/javascript">
<!--
google_ad_client = "pub-2051746026283201";
google_ad_width = 728;
google_ad_height = 15;
google_ad_format = "728x15_0ads_al";
//2007-08-22: federalregister-rss
google_ad_channel = "2005962856";
google_color_border = "CC0000";
google_color_bg = "FFFFFF";
google_color_link = "CC0000";
google_color_text = "000000";
google_color_url = "008000";
//-->
</script>
<script type="text/javascript"
  src="http://pagead2.googlesyndication.com/pagead/show_ads.js">
</script>
]]></description>
  <guid>http://thefederalregister.com/d.p/2008-07-16-E8-16205</guid>
  <pubDate>Wed, Jul 16 2008 11:00:00 GMT</pubDate>
</item>
<item>
  <title><![CDATA[  Hydro Green Energy, LLC; Notice of Preliminary Permit Application  Accepted for Filing and Soliciting Comment, Motions]]></title>
  <link>http://thefederalregister.com/d.p/2008-07-16-E8-16202</link>
  <description><![CDATA[ July 9, 2008.</p><p>    On July 24, 2007, Hydro Green Energy, LLC filed an application, 
pursuant to section 4(f) of the Federal Power Act, proposing to study 
the feasibility of the ``Alaska 31'' Project, located in the Kuskokwim  River, in Bethel Borough, Alaska.</p><p>    The proposed project would consist of: (1) 5 arrays, each 
consisting of ten 100 kilowatt hydrokinetic turbine units, for a total 
installed capacity of 5 megawatts, (2) a proposed 2000footlong, 13.6
kilovolt transmission line, and (3) appurtenant facilities. The project 
is estimated to have an annual generation of 32.872 gigawatthours,  which would be sold to a local utility.</p><p>    Applicant Contact: Wayne Krouse, Hydro Green Energy LLC, 5090 
Richmond Avenue <greeki>390, Houston, TX 77056; phone: 8775566566. </p><p>    FERC Contact: Kelly Houff, 2025026393.</p><p>    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this noti<script type="text/javascript">
<!--
google_ad_client = "pub-2051746026283201";
google_ad_width = 728;
google_ad_height = 15;
google_ad_format = "728x15_0ads_al";
//2007-08-22: federalregister-rss
google_ad_channel = "2005962856";
google_color_border = "CC0000";
google_color_bg = "FFFFFF";
google_color_link = "CC0000";
google_color_text = "000000";
google_color_url = "008000";
//-->
</script>
<script type="text/javascript"
  src="http://pagead2.googlesyndication.com/pagead/show_ads.js">
</script>
]]></description>
  <guid>http://thefederalregister.com/d.p/2008-07-16-E8-16202</guid>
  <pubDate>Wed, Jul 16 2008 11:00:00 GMT</pubDate>
</item>
<item>
  <title><![CDATA[  Idaho Power Company; Notice of Application Tendered for Filing  With the Commission, Soliciting Additional Study]]></title>
  <link>http://thefederalregister.com/d.p/2008-07-16-E8-16211</link>
  <description><![CDATA[ July 9, 2008.</p><p>    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection. </p><p>    a. Type of Application: New Major License.<br/> </p><p>    b. Project No.: P503048.<br/> </p><p>    c. Date Filed: June 26, 2008.<br/> </p><p>    d. Applicant: Idaho Power Company.</p><p>    e. Name of Project: Swan Falls Hydroelectric Project.
</p><p>    f. Location: The Swan Falls Hydroelectric Project is located on the 
Snake River at river mile (RM) 457.7 in Ada and Owyhee counties of 
southwestern Idaho and lies about 35 miles southwest of Boise. Access 
to the Swan Falls Project is by road from Kuna, located about 19 miles 
north of the project. The application states that the project occupies 
528.84 acres of lands of the United States within the Snake River Birds 
of Prey National Conservation Area, including 30.66 acres of federally 
administered lands set aside in the early 1900's for power production  development.</p><p>    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)825(r).
</p><p>    h. Appli<script type="text/javascript">
<!--
google_ad_client = "pub-2051746026283201";
google_ad_width = 728;
google_ad_height = 15;
google_ad_format = "728x15_0ads_al";
//2007-08-22: federalregister-rss
google_ad_channel = "2005962856";
google_color_border = "CC0000";
google_color_bg = "FFFFFF";
google_color_link = "CC0000";
google_color_text = "000000";
google_color_url = "008000";
//-->
</script>
<script type="text/javascript"
  src="http://pagead2.googlesyndication.com/pagead/show_ads.js">
</script>
]]></description>
  <guid>http://thefederalregister.com/d.p/2008-07-16-E8-16211</guid>
  <pubDate>Wed, Jul 16 2008 11:00:00 GMT</pubDate>
</item>
<item>
  <title><![CDATA[  Utah Independent Power; Notice of Preliminary Permit Application  Accepted for Filing and Soliciting Comment, Motions]]></title>
  <link>http://thefederalregister.com/d.p/2008-07-16-E8-16204</link>
  <description><![CDATA[ July 9, 2008.</p><p>    On March 24, 2008, Utah Independent Power filed an application, 
pursuant to section 4(f) of the Federal Power Act, proposing to study 
the feasibility of the Long Canyon Pumped Storage Project, to be 
located in the Long Canyon and the Little Valley in Grand County, Utah.
</p><p>    The proposed project would consist of: (1) Proposed earth and rock
filled dams, 130foothigh and 3,470footlong and 200foothigh and 
790footlong, respectively, for the upper and lower reservoirs which 
would have water surface elevations of 6,010 and 2,400 feet, MSL, 
respectively, (2) a proposed powerhouse containing three generating 
units having a total installed capacity of 800 megawatts, (3) a 
proposed 22,400footlong concrete/steel penstock, (4) a proposed 40
milelong, 250kV transmission line, and (5) appurtenant facilities. 
The project would have an annual generation of 1,077 gigawatthours  that would be sold to a local utility.</p><p>    Applicant Contact: Mr. Frank L. Mazzone, President, Utah 
Independent Power, 957<script type="text/javascript">
<!--
google_ad_client = "pub-2051746026283201";
google_ad_width = 728;
google_ad_height = 15;
google_ad_format = "728x15_0ads_al";
//2007-08-22: federalregister-rss
google_ad_channel = "2005962856";
google_color_border = "CC0000";
google_color_bg = "FFFFFF";
google_color_link = "CC0000";
google_color_text = "000000";
google_color_url = "008000";
//-->
</script>
<script type="text/javascript"
  src="http://pagead2.googlesyndication.com/pagead/show_ads.js">
</script>
]]></description>
  <guid>http://thefederalregister.com/d.p/2008-07-16-E8-16204</guid>
  <pubDate>Wed, Jul 16 2008 11:00:00 GMT</pubDate>
</item>
<item>
  <title><![CDATA[  Utah Independent Power; Notice of Preliminary Permit Application  Accepted for Filing and Soliciting Comment, Motions]]></title>
  <link>http://thefederalregister.com/d.p/2008-07-16-E8-16206</link>
  <description><![CDATA[ July 9, 2008.</p><p>    On May 9, 2008, Utah Independent Power filed an application, 
pursuant to section 4(f) of the Federal Power Act, proposing to study 
the feasibility of the Bull Canyon Pumped Storage Project, to be  located in the Bull Canyon area in Grand County, Utah.</p><p>    The proposed project would consist of: (1) Proposed earth and rock
filled dams, 100foothigh and 4070footlong and 300foothigh and 
730footlong, respectively, for the upper and lower reservoirs which 
would have water surface elevations of 6,020 and 4490 feet, MSL, 
respectively, (2) a proposed powerhouse containing three generating 
units having a total installed capacity of 800 megawatts, (3) a 
proposed 18890footlong penstock, (4) two proposed 40milelong, 250
kV transmission lines, and (5) appurtenant facilities. The project 
would have an annual generation of 1,077 gigawatthours that would be  sold to a local utility.</p><p>    Applicant Contact: Mr. Frank L. Mazzone, President, Utah 
Independent Power, 957 Fairway Drive, Sonoma, CA 95476; p<script type="text/javascript">
<!--
google_ad_client = "pub-2051746026283201";
google_ad_width = 728;
google_ad_height = 15;
google_ad_format = "728x15_0ads_al";
//2007-08-22: federalregister-rss
google_ad_channel = "2005962856";
google_color_border = "CC0000";
google_color_bg = "FFFFFF";
google_color_link = "CC0000";
google_color_text = "000000";
google_color_url = "008000";
//-->
</script>
<script type="text/javascript"
  src="http://pagead2.googlesyndication.com/pagead/show_ads.js">
</script>
]]></description>
  <guid>http://thefederalregister.com/d.p/2008-07-16-E8-16206</guid>
  <pubDate>Wed, Jul 16 2008 11:00:00 GMT</pubDate>
</item>
</channel>
</rss>

